North Lincolnshire Council

Local Transport Plan 2011-2026

Local Transport Plan 2011-2026

A Local Transport Plan is a statutory document setting out how the local authority will deliver strategic transport improvements over a given period of time.

The third Local Transport Plan (LTP3) is a 15 year document, which is made up of two separate documents:

  • a Transport Strategy and
  • an Implementation Plan.

The Transport Strategy sets out the strategic approach to transport in North Lincolnshire over the next 15 years, whilst the Implementation Plan sets out how the Strategy will be delivered.

The Implementation Plan is a three year document and a new one will be produced every three years.

Local Transport Bodies

Local Transport Bodies (LTBs) were created to take on devolved responsibility for Local Major Transport Scheme Funding.  This is funding that used to come from Government to the Yorkshire and Humber region and is now devolved to Local Enterprise Partnership (LEP) boundaries.  Therefore, the Humber LTB is made up of the four Humber authorities (East Riding of Yorkshire, Hull City, North East Lincolnshire and North Lincolnshire Councils) and the Humber LEP.
 
The Humber Local Transport Body was allocated £14.8m for the period 2015/16 to 2018/19.

The following four schemes have been approved for funding from this block:

  • A1079 Holme Roundabout (East Riding of Yorkshire)
  • Bridlington Integrated Transport Plan Phase 2 (East Riding of Yorkshire)
  • Cleethorpes Flyover (North East Lincolnshire)
  • Gauge Enhancements – Immingham to Doncaster (North Lincolnshire)

For more information and minutes of meetings, please visit the North East Lincolnshire Council website.

The Transport Strategy and Implementation Plan are available below:

Please use the links in the chapter headings to access these documents.

Transport strategy:

Chapter 1 – Introduction[PDF, 91Kb]

What is a Local Transport Plan?
North Lincolnshire’s third local transport plan 
Local Transport Plan Framework 
Summary of chapters

Chapter 2 – Strategic Planning context [PDF, 154Kb]

Introduction 
European context 
National context 
Regional context 
Humber area context 
Local context 
Summary

Chapter 3 – Local profile, problems and challenges [PDF, 1Mb]

Introduction 
Spatial profile 
Existing transport network 
Future travel demands 
Summary

Chapter 4 – Local transport goals [PDF, 66kb]

Introduction
A vision for North Lincolnshire 
Local transport goals
Environment, health and equality assessments 
Performance indicators and targets                                                                             Summary

Chapter 5 – Consultation [PDF, 53kb]

Introduction 
The consultation process 
Who has been consulted 
Progress made towards addressing issues raised 
Summary

Chapter 6 – Existing transport documents [PDF, 87kb]

Introduction 
North Lincolnshire’s transport strategy documents 
Location specific – transport strategy documents
Summary

Chapter 7 – Transport options [PDF, 235kb]

Introduction 
Major development areas 
Infrastructure themes 
Transport initiatives 
Summary

Chapter 8 – Prioritisation [PDF, 107kb]

Introduction
Preferred transport options
Affordability
Deliverability and risks
Prioritised transport options Summary

Chapter 9 – Summary [PDF, 35kb]

Implementation Plan[PDF, 912kb]

· Chapter 1 – Introduction
· Chapter 2 – Prioritised transport options
· Chapter 3 – Funding
· Chapter 4 – Delivery management
· Chapter 5 – Monitoring framework
· Chapter 6 – Risk management
· Chapter 7 – Summary and conclusions

Strategic environmental assessment

If you require further information, then please contact us.